20. Scotsbridge Mill, river restoration
Aims: Improve wildlife corridors; Manage flow
Project description
The River Chess at Scotsbridge Mill suffers from a range of problems linked to when the channel was redirected to power the mill.
The elevated nature of the channel, erosion problems, lack of management and high flows led to flooding of properties in 2014. This project aims to improve the resilience, physical characteristics and habitat quality of this stretch of the Chess, enabling fish passage, reducing flood risk and improving the public green space along the river. A feasibilty and options appraisal is currently being undertaken. It is anticipated that the preferred opion will be delivered in 2018-19.